Pressurized plugging of the circulating water line in a 1-million-ton-per-year catalytic hydroconversion unit.


  The 1-million‑ton‑per‑year catalytic hydroconversion unit is a newly added facility at Changling Refining & Chemical, currently under active construction. In connection with the unit’s construction, it is necessary to relocate the DN500 circulating water pipelines at both ends. To ensure uninterrupted production, we have been commissioned to perform pressurized plugging on these two pipelines.
  Upon receiving the commission for pressurized plugging operations, the Pressurized Operations Division of the Equipment Research Institute responded promptly and undertook meticulous preparations. From inspecting the plugging equipment and surveying the construction site conditions to developing the operational plan, all tasks were carried out in an orderly manner despite the sweltering summer heat.
  This pressurized plugging operation has also received high attention from the company’s leadership, who issued the following specific instructions: 1. Given the relatively large pipe diameter involved, this operation presents certain technical challenges; all work must be carried out in strict accordance with the pressurized plugging procedures. 2. In light of the ongoing extreme heat, operations should be scheduled to avoid peak‑heat periods and appropriate measures must be taken to prevent heat‑related illnesses and ensure adequate cooling.
  On July 20, the specialized four-way sealing fitting was delivered to the site and welded onto the DN500 system’s circulating water pipeline. On July 21, the sealing equipment was brought in and installed. On July 22, the pipelines were cut. Given the large diameter of both pipelines, the cutting process took a considerable amount of time; pipeline cutting commenced at 8:00 a.m. and was not completed until 6:00 p.m. On July 24, sealing operations were carried out simultaneously on both pipelines. On July 25, following completion of the sealing, the relevant coordinating units proceeded to cut the pipeline sections requiring relocation and welded blind flanges at the cut ends. On July 26, the gate valves were removed, and blind flanges were installed on the flanges of the four-way fittings. With this, the sealing work was fully completed.
  This pressurized plugging operation lasted a total of seven days. During this period, company leaders visited the site on multiple occasions to monitor progress. Meanwhile, senior officials from the Office and the Technical Production Department even brought us refreshing relief during the sweltering summer heat. With their thoughtful support, the pressurized‑operation team carried out their work with meticulous care and unwavering dedication, ultimately bringing this project to a successful conclusion.